The Project

A programme of planned investment in new seafront infrastructure and beach huts at Canford Cliffs, due to start in 2017, was postponed due to a cliff slip below Cliff Drive that same year. Following an extensive period of planning and monitoring, a 9-month, £2.5 million cliff stabilisation scheme was completed May 2021 [more below].

Work now focuses on the conversion of the pavilion building into a cafe with refurbished public toilets.

Pavilion Café

Progress update: Planning permission granted 13th January 2022

The proposal to enhance this part of the seafront would enable the facility to be used and enjoyed by many more people, more often and by a wider cross-section of the community and includes provision of new shelter for use by open water swimmers.

The specific scope and phasing of any future works at Canford Cliffs will now be considered by the Council’s Seafront Development Board, as part of a wider programme of investment in coastal infrastructure.

The refreshed plans, May 2021

Following feedback on the July 2020 planning application to convert the Canford Cliffs pavilion (APP/20/00765/F) plans were refreshed and re-submitted in 2021, to include:

  1. a shelter
  2. a beach terrace
  3. new level access to the pavilion building achieved by raising the level of the prom rather than installing a ramp, which avoids narrowing the width of the prom
Proposed shelter
Proposed Shelter
Proposed promenade plan & elevation
Proposed promenade plan & elevation
Proposed elevation & section details
Proposed elevation & section details

Cliff stabilisation works

Completed May 2021

Following the cliff slip in 2017, an extensive period of planning and monitoring, specialist contractor, CAN Geotechnical was appointed to deliver a £2.5m cliff stabilisation scheme, which commenced September 2000 and was completed May 2021.

Over 1,600 soil nails were installed with matting and steel net to stabilise the cliff face. On behalf of BCP Council and CAN Geotechnical we would like to thank you for your patience and co-operation throughout the works.

  • Technical details of the cliff stabilisation works can be found at twobays.net

Hydro-seeding and Planting

The cliff face has been coated with a special mix of native wildflowers and grass seed. It will support the natural re-growth that has already begun to support our important wildlife habitat. Some native trees will also be planted on the Cliff Drive greenspace towards the end of the year, when they have the best chance to thrive.

Much of the greenspace has Special Nature Conservation Interest designation (SNCI) so we need to let it regenerate naturally until the Autumn. Temporary fencing will be placed in small sections of Cliff Drive cliff top to help the vegetation re-grow.

Re-instatement works & Access

The work on the clifftop pathway and fence is complete, with a small route deviation around the location of the 2017 cliff slip. Benches will be returned from their safe storage to the cliff top and prom. The zig-zag path to the beach is now open.

Damage to the road, kerb and footpath has been repaired and the original row of timber bollards replaced. Gullies have been repaired and cleaned.

Beach Huts re-opening

Some beach huts blocks have been closed since the cliff slip in 2017. Now the cliff face work has been completed, we can give the Seafront Operations team safe access to survey, maintain and spruce up the huts before they can welcome their beach hut tenants again!

It’s likely that blocks will be released one at a time, in a sequenced way, as they become ready again.

The Beach Hut team will be contacting tenants directly with more information.

FAQs

Why was the cliff stabilisation work needed?

In February 2017, at Canford Cliffs, a section of cliff approximately 10m wide x 0.5m deep eroded and slipped down the cliff face. This resulted in the closure of three blocks of beach huts directly below it, a temporary closure of a short stretch of Cliff Drive undermined by the slip, and the postponement of planned investment in new beach huts and seafront infrastructure.

The slip was large enough to warrant further investigation to establish the likelihood of further movement of the cliff. Following a period of cliff face monitoring (2017-19) the Council considered geology reports and available options prior to agreeing stabilisation works at a cost of approximately £2.5million.

How was the cliff stabilised?

Specialist contractor CAN Geotechnical was appointed to deliver the cliff stabilisation scheme. Over 1600 soil nails (up to 15m in length) were drilled into the embankment using long reach excavators from the top of the cliff and from the promenade below. Drill rigs were suspended from an anchor system installed along the top of the embankment.

How are the works being funded?

Investment from BCP Council, with a £400,000 contribution from the Coastal Communities Fund.

What hours will the contractors be operating?

Site working hours are as follows:

  • Monday to Friday 08:00 – 18:00
  • Weekends 08:00 – 17:00
  • CAN Geotechnical will work an 11 days on/3 days off shift pattern, i.e. alternating working Friday, Saturday and Sunday

We aim to manage and minimise noise levels as best we can throughout the works. We will be using special low noise level plant and installing noise barriers around static plant (such as compressors). We will programme the works as courteously as possible for residents, for instance avoiding noisier activities early in the morning and on Sundays.

What is happening to the memorial benches on the prom, zig zag path and Cliff Drive?

The memorial benches that were temporarily relocated or kept in storage during the cliff repair works will be re-installed. Bench sponsors have been contacted directly with further information.

Specific FAQs for Beach Hut tenants

Which beach huts are affected by the cliff works?

Blocks 1 to 8 at Canford Cliffs beach huts (Hut numbers 1-72). All huts in Block 3 were temporarily removed and stored off site to allow access to the base of the cliff. They will be returned to the prom once works are complete and the huts can be enjoyed again.

Will anybody lose their hut entirely?

No, only temporarily during the works.

Can I move to another Beach Hut while mine is inaccessible?

Unfortunately, we do not have the availability to offer alternative Beach Huts.

What about my Beach Hut licence fee?

Your Beach Hut licence will be frozen from the date that access to your Beach Hut is prohibited. No licence fee payments will be taken by our Finance department while your licence has been frozen. Once works are complete, we will contact you to provide a date from which you can access your Beach Hut once again. It is from this date that your licence payments will re-commence.

Will any additional beach huts be built?

A planning application has been made to refresh permission to convert the Canford Cliffs pavilion shelter building into a café with new public toilet facilities. This includes building 4 additional beach huts and refurbishing the 4 existing huts above the Canford Pavilion. This work was due to start in 2017 but had to be placed on hold due to the cliff slip and subsequent monitoring.

I have more questions or concerns, that are not covered here, where can I find more information?

Cliff stabilisation works – www.poolebay.net

Canford Cliffs beach huts and pavilion shelter:

Beach Hut Blocks 1-4Beach Hut Blocks 1-4+
Beach Hut Blocks 5-9 & zig-zag pathBeach Hut Blocks 5-9 & zig-zag path+
Beach Hut Blocks 9-11 & PavilionBeach Hut Blocks 9-11 & Pavilion+

Canford Cliffs beach pavilion and promenade:

The art deco style beach pavilionThe art deco style beach pavilion+
The beach pavilionThe beach pavilion+
Canford Cliffs beachCanford Cliffs beach+
At the corner of Canford Cliffs ChineAt the corner of Canford Cliffs Chine+
At the corner of Canford Cliffs ChineAt the corner of Canford Cliffs Chine+
Existing beach hut designExisting beach hut design+

Artist’s impressions of this scheme:

Artists impression of the view towards the pavilion and chine+
Artists impression of the view along the promenade and sandbanks+
Published: 15 May, 2024, Last modified:15 May, 2024

Project Details

  • Total Budget £7.3 million
  • Funding BCP Council, with a £400,000 contribution from Coastal Communities Fund
  • Project Lead Anthony Rogers, Head of Seafront
Dorset Coast Forum Coastal Communities Fund

Part funded by the Coastal Communities Fund coordinated by the Dorset Coast Forum

BCP Seafront Strategy

A view of the beach and ocean from a cliff top
A bold and exciting vision for a world class seafront